Valsad district is facing major disruptions as heavy rainfall in the Upper Vas area has led to a significant rise in water levels at the Madhuban Dam. In response to the increased water inflow, authorities have released water from the dam into the Daman Ganga river. This release has created flash flood-like conditions in nearby rivers, resulting in the closure of over 30 roads across the district. The local administration and police have set up barricades and deployed personnel to ensure public safety on these affected routes.
Current Status of Madhuban Dam
Due to persistent rainfall in Upper Vas, Madhuban Dam has reached a water level of 79.30 meters. Authorities have opened 9 gates of the dam, each by 1.20 meters, releasing a total of 53,165 cubic feet per second (cusec) of water into the Daman Ganga river. This step has been taken to regulate river water levels and prevent any possible flooding in surrounding areas.
Impact on Floods and Road Connectivity
The water release from Madhuban Dam, combined with ongoing heavy rainfall, has caused rivers in Valsad district to overflow. Low-level bridges have been submerged due to overtopping, and over 30 major roads have been temporarily closed for vehicular traffic. The sudden closure of so many routes has created significant inconvenience for residents, making daily travel difficult and potentially unsafe.
Administrative Measures and Safety Arrangements
To ensure public safety, the Valsad administration has taken immediate action. Police teams and local authorities have placed barricades at closed routes to prevent people from entering dangerous areas. Residents are being urged to avoid blocked roads and use only designated safe routes. Continuous monitoring of water levels is being carried out to manage any further risks.
Warnings for Local Residents
Officials have advised residents of low-lying and riverside areas to remain alert. Updates are being regularly communicated to the public regarding road conditions and river water levels. In case of emergencies, authorities are prepared to evacuate people from affected areas to safer locations. Public cooperation is being requested to ensure safety and prevent accidents during this critical period.
Conclusion
The release of water from Madhuban Dam in Valsad has led to significant challenges, including road closures and flood risks. The local administration and police are actively managing the situation to ensure safety. Residents are being urged to stay cautious, follow official instructions, and avoid travel on closed roads. With proper safety measures in place, the authorities aim to minimize disruptions and protect lives and property in Valsad district.